Completed Projects

Completed Projects

Construction Supervision for Feasibility Study, Preparation of Detailed Project Report and providing Pre-Construction Services for upgradation of existing 2-lane highway to 4 lanes with paved shoulder configuration (NH-144A) from Km 26.350 (Khati Chowk) to Km 30.097 (Hanuman Chowk) of Jammu – Akhnoor Section in the state of Jammu & Kashmir on EPC. basis.

Besides above work, IEAL completed additional scope of Package - I (4th Tawi Bridge to Canal Head of NH-144A)

Client: NHIDCL

Role: Sole

Services for Assisting Authority’s Engineer for Supervision of Highway & Tunnel work in the Union Territory of Jammu & Kashmir.

Client: NHIDCL

Role: Sole

Carrying out Airborne Electromagnetic Survey (AEM) in the state of Jammu and Kashmir for the following proposed tunnels: (i) Zojila Tunnel (ii) Lachalung La Tunnel (iii) Tanglang La Tunnel (iv) Shinkun La Tunnel

Lead Partner: Norwegian Geotechnical Institute-NGI


Client: NHIDCL

Role: JV Partner

Construction Supervision for Preparation of Detailed Project Report including Pre-Construction activities for Construction of a Road Tunnel for NH-148AE with its approach and connection to NH-248BB and existing Delhi internal roads in the State of Delhi.

Lead Partner: SMEC

Client: NHAI

Role: Associate

Consultancy Services for Preparation of Detailed Project Report and providing Pre - Construction activities:

i) For construction of Approach Roads with Avalanche Protection Works to West and East portal of the proposed Zojila Tunnel between (between Baltal and Minamarg) from km 82.00 to km 95.00 on Srinagar - Leh road (NH -1) and;

ii) For making the NH -1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx. 20 km) all weather road in the State of Jammu and Kashmir.

Lead Partner: SMEC

Client: NHIDCL

Role: Associate

Execution of Geo Tech Exploration and Preparation of GAD of Important bridges, Major Bridges and minor bridges, RUB/LHS, ROB, Buildings, Station yards, Level crossing, along with fixing of Rail boundary pillar in connection with Wadsa - Gadchiroli new line project.

Client: SECR

Role: Sole

Carrying out Geotechnical investigation for Nagpur Metro Extension- Phase II.

Client: RITES Ltd.

Role: Sole