Ongoing Projects
Ongoing Projects

Authority Engineer for Supervision of Construction of:
(i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and
(ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the UT of Jammu and Kashmir and Ladakh
Lead Partner: ICT
Client: NHIDCL
Role: JV Partner

Independent Engineer for Construction, Operation and Maintenance of Z-Morh tunnel including approaches on National Highways No. 1 (Srinagar Sonamarg Gumri Road) in the UT of Jammu and Kashmir on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis Project.
Lead Partner: ICT
Client: NHIDCL
Role: JV Partner

Authority Engineer for widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the state of Mizoram from km 125.000 to km 250.000 Section-2 on EPC mode with JICA loan assistance.
Lead Partner: TPF-Rodic JV
Client: NHAI
Role: Associate Member

Authority Engineer for Up-gradation / Widening and construction of 4 – lane with paved shoulders from Srirampur to Dhubri (Length 54.154 km) of NH-127B in the State of Assam under JICA ODA Loan assistance (Phase V) on EPC mode.
Lead Partner: ICT
Client: NHIDCL
Role: Associate Member

Consultancy Services for Preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Madhya Pradesh (Pkg-01)
Lead: Global
Client: MoRTH
Role: Associate Member

Construction Supervision for Preparation of Detailed Project Report for 2 laning of Aizawl Bypass including Tunnel (Connecting Sairang on NH-306 to NH-02) in the State of Mizoram under Bharatmala Pariyojna.
Lead Partner: C M Engineering & Solution
Client: NHIDCL
Role: JV Partner

Independent Engineer Services for Supervision of Construction of 6 lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Sagrampur Village (From KM. 116.000 to KM. 184.700) under Bharatmala Pariyojana in the state of Bihar on Hybrid Annuity Mode (Pkgs 6 and 7).
Lead: ICT
Client: NHAI
Role: Associate Member

Authority Engineer for Supervision of Construction of 4 Lane Elevated Corridor and at-grade improvements from Design Ch:0+000 to Design Ch: 19+870 of Danapur – Bihta Section with providing connectivity to the existing RoB near Danapur station (0.231 km), 1.35 Km ramps & at-grade improvements to Four lane section on Danapur side and Upgradation of existing Two lane carriageway to Four Lane carriageway from Design Ch:19+870 to Design Ch:23+500 of Bihta - Koilwar section (Total Length 25.081 Kms) in the state of Bihar on EPC Mode.
Lead Partner: ICT
Client: NHAI
Role: Associate Member

Selection of Consultant for Independent Engineer Consultancy Services for Civil Works under Enhancing Connectivity and Resilience of Madhya Pradesh Road Network Project (ECRMPRNP): Pkg A
Lead: ICT
Client: MPRDC
Role: Sub Consultant

Appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Services at:
1) Various Construction Sites on Bhuj - Naliya Section (101.40 Km) in Western Railway.
2) For Major up-gradation of New Bhuj Railway Station in Western Railway.
3) For construction of major railway bridges, Minor Bridges, RUB’s, Earth work, Track Laying and miscellaneous Civil works in Mid-section from Rajkot - Kanalus section in western railway.
Lead Partner: ICT
Client: Western Railway
Role: Sub Consultant